Roadway and Trail Projects

Parks Highway MP 39 to 42 Seward Meridian to Crusey

  • Date: 2001 – 2003
  • Location: Wasilla
  • Client: R&M Consultants
  • Owner/Funding Agency: ADOT

Provided roadway lighting and signalization design. Including high-mast lighting and pedestrian undercrossing lighting and signal interconnect system.

C Street Extension Dimond to O’Malley

  • Date: 2002 – 2004
  • Location: Anchorage
  • Client: R&M Consultants
  • Owner/Funding Agency: ADOT

Provided roadway lighting and signalization design. Including high-mast lighting and a fiber optic signal interconnect system.

Bragaw Street Debarr to Genn Highway

  • Date: 2003
  • Location: Anchorage
  • Client: R&M Consultants
  • Owner/Funding Agency: Municipality of Anchorage

Provided roadway lighting and signalization design for a surface rehabilitation project.

Parks Highway & Church Rd Intersection

  • Date: 2004
  • Location: Wasilla
  • Client: Hattenburg Dilley & Linnell
  • Owner/Funding Agency: ADOT

Provided roadway lighting and signalization design for a span wire signal system.

Campbell Creek Trail Lighting

  • Location: Anchorage
  • Client: CRW Engineering Group
  • Owner/Funding Agency: ADOT

Provided trail lighting design for a new trail system.