Roadway and Trail Projects
Parks Highway MP 39 to 42 Seward Meridian to Crusey
- Date: 2001 – 2003
- Location: Wasilla
- Client: R&M Consultants
- Owner/Funding Agency: ADOT
Provided roadway lighting and signalization design. Including high-mast lighting and pedestrian undercrossing lighting and signal interconnect system.
C Street Extension Dimond to O’Malley
- Date: 2002 – 2004
- Location: Anchorage
- Client: R&M Consultants
- Owner/Funding Agency: ADOT
Provided roadway lighting and signalization design. Including high-mast lighting and a fiber optic signal interconnect system.
Bragaw Street Debarr to Genn Highway
- Date: 2003
- Location: Anchorage
- Client: R&M Consultants
- Owner/Funding Agency: Municipality of Anchorage
Provided roadway lighting and signalization design for a surface rehabilitation project.
Parks Highway & Church Rd Intersection
- Date: 2004
- Location: Wasilla
- Client: Hattenburg Dilley & Linnell
- Owner/Funding Agency: ADOT
Provided roadway lighting and signalization design for a span wire signal system.
Campbell Creek Trail Lighting
- Location: Anchorage
- Client: CRW Engineering Group
- Owner/Funding Agency: ADOT
Provided trail lighting design for a new trail system.
