Solid Waste & Environmental Projects
Kenai Peninsula Borough, Central Regional Landfill Expansion
- Date: 2004
- Location: Sterling
- Client: URS
- Owner/Funding Agency: Kenai Borough
Provided electrical power, lighting, control panel and instrumentation, and mechanical fuel piping and HVAC designs for a new landfill cell leachate reservoir, blower/pumping builing and truck loading station.
Rocky Ridge Landfill
- Date: 2004
- Location: Seldovia
- Client: URS
- Owner/Funding Agency: Kenai Borough
Provided electrical power and area lighting designs a new landfill and attendant shed.
Solid Waste Facilities Equipment Building
- Date: 2003
- Location: Dillingham
- Client: HDR
- Owner/Funding Agency: City of Dillingham
Provide electrical power, lighting and heat trace, and mechanical fuel piping and HVAC designs for a new solid waste transfer site equipment building.
Pedro Bay Solid Waste Transfer Facility
- Date: 2003
- Location: Pedro Bay
- Client: Montgomery Watson Harza
- Owner/Funding Agency: Village of Pedro Bay
Provide electrical power and lighting, and mechanical fuel piping and HVAC designs for a new solid waste transfer site equipment building.
Palmer Wastewater Treatment Lagoons
- Date: 1998
- Location: Palmer
- Client: Neil Hawthorne Engineering
- Owner/Funding Agency: City of Palmer
Provided electrical power, lighting and control system design for a lagoon blower building.