Solid Waste & Environmental Projects

Kenai Peninsula Borough, Central Regional Landfill Expansion

  • Date: 2004
  • Location: Sterling
  • Client: URS
  • Owner/Funding Agency: Kenai Borough

Provided electrical power, lighting, control panel and instrumentation, and mechanical fuel piping and HVAC designs for a new landfill cell leachate reservoir, blower/pumping builing and truck loading station.

Rocky Ridge Landfill

  • Date: 2004
  • Location: Seldovia
  • Client: URS
  • Owner/Funding Agency: Kenai Borough

Provided electrical power and area lighting designs a new landfill and attendant shed.

Solid Waste Facilities Equipment Building

  • Date: 2003
  • Location: Dillingham
  • Client: HDR
  • Owner/Funding Agency: City of Dillingham

Provide electrical power, lighting and heat trace, and mechanical fuel piping and HVAC designs for a new solid waste transfer site equipment building.

Pedro Bay Solid Waste Transfer Facility

  • Date: 2003
  • Location: Pedro Bay
  • Client: Montgomery Watson Harza
  • Owner/Funding Agency: Village of Pedro Bay

Provide electrical power and lighting, and mechanical fuel piping and HVAC designs for a new solid waste transfer site equipment building.

Palmer Wastewater Treatment Lagoons

  • Date: 1998
  • Location: Palmer
  • Client: Neil Hawthorne Engineering
  • Owner/Funding Agency: City of Palmer

Provided electrical power, lighting and control system design for a lagoon blower building.